Logo
Loenbro

Senior Electrical Project Manager - Data Center Construction

Loenbro, Cedar Rapids

Save Job

Position: Senior Electrical Project Manager - Data Center Construction

Company: Loenbro Mission Critical

Reports To: Regional Manager

Location: Cedar Rapids, Iowa


Position Overview: Responsible for planning, scheduling, estimating, employee oversite, and management of Data Center construction projects. Assists craft supervision in coordinating activities of workers engaged in construction process, utilizing knowledge of equipment, techniques, procedures and specifications.


Job Duties

  • Oversee Data Center construction projects from setup to closeout.
  • Responsible for recruiting, managing and leading teams of employees, including Project Engineer, Field Engineer, Superintendent and Foreman.
  • Supervises daily work of employees.
  • Verifies conformance of finished work product, including overseeing compliance with all contract requirements.
  • Responsible for ensuring all safety and environmental requirements are met.
  • Coordination of all labor, equipment, and subcontractor resources with Project subordinates and other Loenbro companies to ensure timely, cost effective completion of project.
  • Assures all employees within the team know and follow the company safety and work rules and policies.
  • Ensures that all employees within the department receive the proper training required in order for them to operate the machines they will be working on.
  • Assigns work and monitors job costs and overall performance, including monthly forecasting.
  • Completes written reports of job process, cost and other matters as requested.
  • Supports planning of on-the-job training to team members to ensure safety and quality of the work being done. Constantly monitors the job site for safety and quality of the work.
  • Work closely with all areas of the operations to create new opportunities for Loenbro.
  • Review and provide feedback on overall project schedule, working with Project Engineer to update and distribute to internal and external stakeholders
  • Ability to produce a cost based estimate for RFP’s that are sent to Loenbro.
  • Perform all other duties as assigned


Skills/Qualifications

  • Engineering or Construction Management Degree preferred.
  • Minimum of 4 years of experience in the construction of Data Center projects.
  • Minimum of 10 years of experience as a manager in the electrical field.
  • Experience with P6 or similar scheduling software.
  • Experience with Viewpoint or similar account software.
  • Proficient with all Microsoft Office products.
  • Completion of OSHA or equivalent safety training.
  • Driver’s license with a clean driving record.


Potential Hazards

  • Potential exposure to extreme cold and hot temperatures
  • Limited working surfaces
  • The use of X-ray machines
  • Exposure to noise above 85 decibels and intense odors
  • Exposure to areas with limited visibility


Essential Requirements

  • Climbing up and down stairs and ladders to both get in and out of trenches and up to elevated platforms (scaffolding at significant heights)
  • Lifting necessary equipment and materials 1-50 pounds, 50% of the time on a monthly basis for required tasks
  • Potential or Periodic amounts of time for the following:
  • Walking on uneven terrain, with an average of 2 miles per day
  • Standing
  • Sit, stoop, crawl, and kneel
  • use of respirator if position requires
  • Driving if required to travel
  • If driving is required, valid driver license and proof of insurability is required. All drivers are subject to a DMV background records search. Must be 21 years of age or older to operate a company vehicle.
  • Must be 18 years of age or older.


Benefits

  • Health, Dental, and Vision Insurance- Up to 80% of the Employee portion paid
  • Health Savings Account (HSA) optional enrollment
  • Paid Time Off after waiting period
  • 401k after 90 days of employment with a company match up to 4% (Employees are 100% vested after 90 day waiting period.)
  • Employee paid Dental, Vision, Life and Accident Insurance


We Are “Leading The Change” In The Energy Services Industry. Our Growth And Successes Have Not Changed Who We Are. We Live Our Core Values Every Day

WE TAKE ACTION

We DO WHAT WE SAY

WE LEAD BY EXAMPLE

WE DO THE RIGHT THING

WE PRACTICE STEWARDSHIP

  • Loenbro is an Equal Opportunity Employer.