Cajun Industries
More information about this job
Overview
The Scheduler is responsible for developing, maintaining, and updating Critical Path Method (CPM) schedules for construction projects using Primavera P6. This position works closely with estimating, project managers & site management to ensure accurate planning and timely completion of all project phases.
Responsibilities * The following are intended as general illustrations of the work in this job class and are not all-inclusive for this position.
Develop and maintain master project & proposal schedules using Primavera P6 in collaboration with the Estimator, Project Manager and Superintendent
Plan and sequence all-construction related activities by assigning logic ties and relationships to reflect accurate project flow
Perform regular site walks to verify actual progress and collect field data for schedule updates
Utilize the Primavera P6 Schedule Log to assess schedule health and identify logic errors, open ends, negative float, and other critical issues
Conduct weekly schedule review meetings with Project Manager/Superintendent to assess progress
Prepare and distribute updated schedules to field teams as needed to guide construction activities
Ensure all schedule versions are properly distributed and archived according to the requirements of the Project Manager and client
Qualifications The Scheduler must have a solid understanding of the following Primavera P6 concepts and tools:
Critical Path Method (CPM)
Activity ID and Activity Types
Work Breakdown Structure (WBS)
Activity Relationships (FS, SS, FF, SF)
Activity Codes
Resources and Labor Units
Lag
Total Float and Free Float
Calendars (Project, Activity, Resource)
Constraints (Start On, Finish On, Mandatory, )
Baselines and Variance Analysis
Data Date and schedule updates
Budgeted vs. Actuals
Schedule Log Review
Physical
Must be able to lift up to 25 , but may occasionally lift up to 50 lbs.
Hearing and comprehension is necessary for giving and receiving directions
Will need to perform sedentary to heavy work
Will operate office equipment of all types
Climb and maintain balance on steel/wood framework, stairs, ladders and scaffolds
Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis
Position may require prolonged bending/twisting, walking, reaching overhead, squatting, sitting or standing and lifting
Must be able to manipulate and traverse uneven terrain, ladders, and multi-floor buildings with no elevator
Must be able to walk on uneven surfaces, muddy conditions, loose rock, loose/soft sand,
Will be exposed to adverse weather conditions (Heat, Cold, Rain, )
Vision requirements include close vision, distance vision, and ability to adjust focus
Ability to drive cars/trucks as needed
Mental
Must have the ability to communicate effectively with management/supervision
Talking and reading & writing comprehension is necessary for giving and receiving directions to perform work and/or safety policy
Ability to use math/complete calculations
Work at various tempos, and concentrate amid distractions
Decision making skills necessary
Detail-oriented; must be able to remember, examine, and observe details
Responsibilities * The following are intended as general illustrations of the work in this job class and are not all-inclusive for this position.
Develop and maintain master project & proposal schedules using Primavera P6 in collaboration with the Estimator, Project Manager and Superintendent
Plan and sequence all-construction related activities by assigning logic ties and relationships to reflect accurate project flow
Perform regular site walks to verify actual progress and collect field data for schedule updates
Utilize the Primavera P6 Schedule Log to assess schedule health and identify logic errors, open ends, negative float, and other critical issues
Conduct weekly schedule review meetings with Project Manager/Superintendent to assess progress
Prepare and distribute updated schedules to field teams as needed to guide construction activities
Ensure all schedule versions are properly distributed and archived according to the requirements of the Project Manager and client
Qualifications The Scheduler must have a solid understanding of the following Primavera P6 concepts and tools:
Critical Path Method (CPM)
Activity ID and Activity Types
Work Breakdown Structure (WBS)
Activity Relationships (FS, SS, FF, SF)
Activity Codes
Resources and Labor Units
Lag
Total Float and Free Float
Calendars (Project, Activity, Resource)
Constraints (Start On, Finish On, Mandatory, )
Baselines and Variance Analysis
Data Date and schedule updates
Budgeted vs. Actuals
Schedule Log Review
Physical
Must be able to lift up to 25 , but may occasionally lift up to 50 lbs.
Hearing and comprehension is necessary for giving and receiving directions
Will need to perform sedentary to heavy work
Will operate office equipment of all types
Climb and maintain balance on steel/wood framework, stairs, ladders and scaffolds
Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis
Position may require prolonged bending/twisting, walking, reaching overhead, squatting, sitting or standing and lifting
Must be able to manipulate and traverse uneven terrain, ladders, and multi-floor buildings with no elevator
Must be able to walk on uneven surfaces, muddy conditions, loose rock, loose/soft sand,
Will be exposed to adverse weather conditions (Heat, Cold, Rain, )
Vision requirements include close vision, distance vision, and ability to adjust focus
Ability to drive cars/trucks as needed
Mental
Must have the ability to communicate effectively with management/supervision
Talking and reading & writing comprehension is necessary for giving and receiving directions to perform work and/or safety policy
Ability to use math/complete calculations
Work at various tempos, and concentrate amid distractions
Decision making skills necessary
Detail-oriented; must be able to remember, examine, and observe details