Logo
Generac Power Systems

Data Center Construction Integration Manager - Constructiv

Generac Power Systems, Sacramento, California, United States, 95828

Save Job

We are Constructiv, a Generac Company, empowering your technology through mission critical infrastructure delivery.

Our team has over 20 years of technical project delivery experience. During this period, we have established a standard for building the critical power and cooling infrastructure that supports data centers

As we continue to

expand, Constructiv is

building a pipeline of skilled construction professionals for future opportunities in the United States. While we currently do not have immediate openings, we want to connect with talented individuals in the data center construction industry who are open to exploring roles with us when the time is right.

Travel

:

Travel is required - up to 90%. 90% is required due to assignment being on site/physical location, living in temporary housing. Onsite is Monday - Friday with occasional off hours work, nights and weekends as needed.

Current focus is on candidates located in the following areas:

Phoenix, AZ

San Jose, CA

Roles and Responsibilities:

Oversee the full integration process post base-building completion to ensure data centers are "Ready for Network Install" (RNI) and "Ready for Server Install" (RSI).

Lead cross-functional teams including general contractors, lease providers, and internal stakeholders to meet critical project milestones and handoffs.

Manage installation and commissioning (Cx) of network infrastructure systems including WAN, LAN, and WLAN. Ensure compliance with technical specifications and timelines.

Actively promote and enforce a culture of safety on-site, ensuring all work is conducted in alignment with established safety protocols.

Daily Operations:

45% Onsite fieldwork including site walks, progress checks, and safety meetings with field teams.

55% Documentation tasks including checklists, reports, and milestone tracking using enterprise tools (O365, etc.).

Engage with internal teams such as Data Center Operations (DC Ops), End-to-End Delivery (E2E), Security, Engineering, Site Acquisition, and EHS to drive alignment and progress.

Track and report on project status, RFIs, constraints, dependencies, and safety compliance. Provide weekly updates in accordance with organizational standards.

Meeting project deadlines aligned with business and customer needs.

Promoting and maintaining a safe working environment.

Minimum Qualifications:

High school diploma or GED required.

5-7 years of experience in data center or mission-critical construction project management.

5+ years in Construction Management, Documentation & Professional Communication & Telecom/Network System Integration

Proven ability to lead integration of telecom and network systems in large-scale construction projects.

Proficiency in analyzing project schedules and tracking technical scope.

Knowledge / Skills / Abilities

Excellent documentation and professional communication skills.

Advanced experience with Microsoft Office 365 or equivalent enterprise tools.

Preferred Qualifications:

Degree in Construction Management, Telecommunications, Engineering, or a related field.

PMP, LEED, or RCDD certification.

OSHA 30 and/or NFPA 70E certification.

PMI- PMP (Project Management Professional)

BICSI- DCDC (Data Center Design Consultant)

Uptime Institute ATD (Accredited Tier Designer)

Work Experience

Familiarity with commercial lease agreements and associated construction deliverables.

Compensation

: Constructiv is committed to fair and equitable compensation practices. The annual salary for this role is $91,300 - $136,900. This compensation will ultimately be in line with the location in which the position is filled. Final compensation for this role will be determined by various factors such as a candidate's relevant work experience, skills, certifications, and geographic location. This role is eligible for variable compensation including short term and long-term incentives.

Physical Demands

: While performing the duties of this job, the employee is regularly required to talk and hear; and use hands to manipulate objects or controls. The employee is regularly required to stand and walk. On occasion the incumbent may be required to stoop, bend or reach above the shoulders. The employee must occasionally lift up to 25 pounds. Specific conditions of this job are typical of frequent and continuous computer-based work requiring periods of sitting, close vision and ability to adjust focus. Occasional travel.

"We are an equal opportunity employer and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, national origin, disability status, protected veteran status, or any other characteristic protected by law."

Over the 60 plus years of Generac's history, we've been dedicated to energy innovation. From creating the home standby generator market category, to our current evolution into an energy technology solutions company, we continue to push new boundaries.

As one of the leaders and largest suppliers of power generation equipment and technology, the work we do touches millions of lives. Employees at Generac are encouraged to be innovative and are valued as an integral part of our global team. Our challenging goals develop knowledgeable employees dedicated to helping continue Generac's success. Generac provides individuals the opportunity to work in a fast-paced agile work environment where their work makes a difference in people's lives and their own.