Generac
Data Center Construction Integration Manager - Constructiv
Generac, Des Moines, Iowa, United States, 50319
Constructiv Data Center Construction Professional
We are Constructiv, a Generac Company, empowering your technology through mission critical infrastructure delivery. Our team has over 20 years of technical project delivery experience. During this period, we have established a standard for building the critical power and cooling infrastructure that supports data centers. Travel
Travel is required up to 90%. 90% is required due to assignment being on site/physical location, living in temporary housing. Onsite is Monday - Friday with occasional off hours work, nights and weekends as needed. Current Focus Areas
Irving, TX Des Moines, IA Wenatchee, WA Major Responsibilities
Oversee the full integration process post base-building completion to ensure data centers are "Ready for Network Install" (RNI) and "Ready for Server Install" (RSI). Lead cross-functional teams including general contractors, lease providers, and internal stakeholders to meet critical project milestones and handoffs. Manage installation and commissioning (Cx) of network infrastructure systems including WAN, LAN, and WLAN. Ensure compliance with technical specifications and timelines. Actively promote and enforce a culture of safety on-site, ensuring all work is conducted in alignment with established safety protocols. Daily Operations:
45% Onsite fieldwork including site walks, progress checks, and safety meetings with field teams. 55% Documentation tasks including checklists, reports, and milestone tracking using enterprise tools (O365, etc.).
Engage with internal teams such as Data Center Operations (DC Ops), End-to-End Delivery (E2E), Security, Engineering, Site Acquisition, and EHS to drive alignment and progress. Track and report on project status, RFIs, constraints, dependencies, and safety compliance. Provide weekly updates in accordance with organizational standards. Meeting project deadlines aligned with business and customer needs. Promoting and maintaining a safe working environment. Minimum Job Requirements
Education High school diploma or GED required. Work Experience 57 years of experience in data center or mission-critical construction project management. 5+ years in Construction Management, Documentation & Professional Communication & Telecom/Network System Integration Proven ability to lead integration of telecom and network systems in large-scale construction projects. Proficiency in analyzing project schedules and tracking technical scope. Knowledge / Skills / Abilities Excellent documentation and professional communication skills. Advanced experience with Microsoft Office 365 or equivalent enterprise tools. Preferred Job Requirements
Education Degree in Construction Management, Telecommunications, Engineering, or a related field. Certification / License PMP, LEED, or RCDD certification. OSHA 30 and/or NFPA 70E certification. PMI- PMP (Project Management Professional) BICSI- DCDC (Data Center Design Consultant) Uptime Institute ATD (Accredited Tier Designer) Work Experience Familiarity with commercial lease agreements and associated construction deliverables. Physical Requirements and Working Conditions
While performing the duties of this job, the employee is regularly required to talk and hear; and use hands to manipulate objects or controls. The employee is regularly required to stand and walk. On occasion, the incumbent may be required to stoop, bend, or reach above the shoulders. The employee must occasionally lift up to 25 pounds. Specific conditions of this job are typical of frequent and continuous computer-based work requiring periods of sitting, close vision, and the ability to adjust focus. Occasional travel. While performing the duties of this job, the employee is regularly required to stand. The employee is frequently required to use hands to manipulate objects, tools, or controls; and to talk and hear. The employee is regularly required to walk, stoop, crouch, bend and reach above shoulders. The employee must frequently lift and/or move up to 50 pounds unassisted and up to 100 pounds with assistance, waist high, up to 10 feet away. This job's specific vision abilities include close vision, distance vision, peripheral vision, and depth perception. While performing the duties of this job, the employee will be working in the typical conditions of a manufacturing environment, including seasonal variations in temperatures and occasional exposure to manufacturing fumes or byproducts. The employee must comply with the assigned location PPE requirements, including but not limited to safety glasses, hearing protection, appropriate gloves, clothing, and shields for required tasks, and closed-toed or safety shoes as required by facility safety policies. The employee must be able to work in varying weather conditions including extreme heat, snow, and ice. The employee may be required to obtain a DOT Medical Card and have the ability to drive a heavy-duty truck on a daily basis. We are an equal opportunity employer and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, national origin, disability status, protected veteran status, or any other characteristic protected by law.
We are Constructiv, a Generac Company, empowering your technology through mission critical infrastructure delivery. Our team has over 20 years of technical project delivery experience. During this period, we have established a standard for building the critical power and cooling infrastructure that supports data centers. Travel
Travel is required up to 90%. 90% is required due to assignment being on site/physical location, living in temporary housing. Onsite is Monday - Friday with occasional off hours work, nights and weekends as needed. Current Focus Areas
Irving, TX Des Moines, IA Wenatchee, WA Major Responsibilities
Oversee the full integration process post base-building completion to ensure data centers are "Ready for Network Install" (RNI) and "Ready for Server Install" (RSI). Lead cross-functional teams including general contractors, lease providers, and internal stakeholders to meet critical project milestones and handoffs. Manage installation and commissioning (Cx) of network infrastructure systems including WAN, LAN, and WLAN. Ensure compliance with technical specifications and timelines. Actively promote and enforce a culture of safety on-site, ensuring all work is conducted in alignment with established safety protocols. Daily Operations:
45% Onsite fieldwork including site walks, progress checks, and safety meetings with field teams. 55% Documentation tasks including checklists, reports, and milestone tracking using enterprise tools (O365, etc.).
Engage with internal teams such as Data Center Operations (DC Ops), End-to-End Delivery (E2E), Security, Engineering, Site Acquisition, and EHS to drive alignment and progress. Track and report on project status, RFIs, constraints, dependencies, and safety compliance. Provide weekly updates in accordance with organizational standards. Meeting project deadlines aligned with business and customer needs. Promoting and maintaining a safe working environment. Minimum Job Requirements
Education High school diploma or GED required. Work Experience 57 years of experience in data center or mission-critical construction project management. 5+ years in Construction Management, Documentation & Professional Communication & Telecom/Network System Integration Proven ability to lead integration of telecom and network systems in large-scale construction projects. Proficiency in analyzing project schedules and tracking technical scope. Knowledge / Skills / Abilities Excellent documentation and professional communication skills. Advanced experience with Microsoft Office 365 or equivalent enterprise tools. Preferred Job Requirements
Education Degree in Construction Management, Telecommunications, Engineering, or a related field. Certification / License PMP, LEED, or RCDD certification. OSHA 30 and/or NFPA 70E certification. PMI- PMP (Project Management Professional) BICSI- DCDC (Data Center Design Consultant) Uptime Institute ATD (Accredited Tier Designer) Work Experience Familiarity with commercial lease agreements and associated construction deliverables. Physical Requirements and Working Conditions
While performing the duties of this job, the employee is regularly required to talk and hear; and use hands to manipulate objects or controls. The employee is regularly required to stand and walk. On occasion, the incumbent may be required to stoop, bend, or reach above the shoulders. The employee must occasionally lift up to 25 pounds. Specific conditions of this job are typical of frequent and continuous computer-based work requiring periods of sitting, close vision, and the ability to adjust focus. Occasional travel. While performing the duties of this job, the employee is regularly required to stand. The employee is frequently required to use hands to manipulate objects, tools, or controls; and to talk and hear. The employee is regularly required to walk, stoop, crouch, bend and reach above shoulders. The employee must frequently lift and/or move up to 50 pounds unassisted and up to 100 pounds with assistance, waist high, up to 10 feet away. This job's specific vision abilities include close vision, distance vision, peripheral vision, and depth perception. While performing the duties of this job, the employee will be working in the typical conditions of a manufacturing environment, including seasonal variations in temperatures and occasional exposure to manufacturing fumes or byproducts. The employee must comply with the assigned location PPE requirements, including but not limited to safety glasses, hearing protection, appropriate gloves, clothing, and shields for required tasks, and closed-toed or safety shoes as required by facility safety policies. The employee must be able to work in varying weather conditions including extreme heat, snow, and ice. The employee may be required to obtain a DOT Medical Card and have the ability to drive a heavy-duty truck on a daily basis. We are an equal opportunity employer and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, national origin, disability status, protected veteran status, or any other characteristic protected by law.