Klingelhofer Management Group LLC
Laborer (Underground Utilities / Data Center Construction)
Klingelhofer Management Group LLC, Columbus, Ohio, United States, 43224
Laborer - Underground Utilities / Data Center Construction
Department:
Field Operations - Civil / Underground Utilities
Reports To:
Foreman / Superintendent
Location:
Columbus & New Albany, OH
FLSA Status:
Non-Exempt / Hourly
Position Summary
The Laborer supports underground utility, trenching, and duct-bank installation crews by performing a variety of physical and semi-skilled tasks on active construction sites. This position works closely with equipment operators and foremen to ensure safe, efficient, and high-quality installation of underground infrastructure for data-center and large-scale site development projects. The Laborer must demonstrate strong safety awareness, teamwork, and reliability in fast-paced construction environments.
Key Responsibilities
Site & Utility Support
- Assist in trenching, pipe laying, duct-bank, and vault installation. - Prepare, clean, and maintain work areas, trenches, and equipment. - Hand-grade, backfill, and compact soil using shovels, tampers, or compactors. - Help set trench boxes, slide-rail systems, and shoring equipment. - Install conduit spacers, tracer wire, and encasement for electrical and communication duct banks. - Support concrete encasement and formwork placement under supervision. - Spot and communicate with heavy equipment operators during excavation and backfilling.
Safety & Compliance
- Follow all company safety policies and OSHA Subpart P (Trenching & Excavation) standards. - Attend daily safety briefings and Job Hazard Analysis (JHA) meetings. - Use required PPE and maintain awareness of equipment and excavation zones. - Immediately report unsafe conditions or potential hazards to supervision. - Assist with traffic control, barricading, and trench protection setup.
Equipment & Material Handling
- Load, unload, and organize materials, tools, and equipment. - Perform routine maintenance and cleaning of tools and small equipment. - Operate hand and small power tools safely (e.g., cutoff saws, compactors, pumps). - Assist in verifying measurements, grades, and alignment.
Teamwork & Productivity
- Work cooperatively under direction of foremen and operators. - Maintain productivity standards while ensuring quality workmanship. - Support multiple phases of work and adapt to changing site conditions. - Uphold company values for safety, respect, and professionalism on every job site.
Qualifications
Required:
- 1+ years of experience in underground utilities, site development, or general construction. - Knowledge of trenching, shoring, and safe excavation practices. - Ability to understand and follow verbal and written instructions in English. - Reliable transportation to job sites within the Columbus / New Albany region. - Willingness to comply with drug testing and safety requirements. - Strong work ethic, punctuality, and commitment to teamwork.
Preferred:
- OSHA 10-Hour Construction Safety Certification. - Experience supporting data-center or mission-critical infrastructure projects. - Familiarity with duct-bank installation, conduit alignment, or vault work. - Competent Person or trench safety training (a plus).
Physical Requirements
- Ability to perform physical labor for extended periods (8-10 hours/day). - Frequent standing, walking, bending, and lifting up to 50 lbs. - Ability to work outdoors year-round in varying weather conditions. - Must be able to perform essential job functions with or without reasonable accommodation.
Work Environment
- Outdoor construction sites with exposure to dirt, dust, noise, and heavy equipment. - May require overtime, weekends, or night work depending on project schedule. - Projects primarily located in Columbus and New Albany, Ohio.
Compensation & Benefits
- Competitive hourly wage based on experience. - Overtime opportunities. - Health, dental, and vision insurance. - 401(k) with company match. - Paid holidays and time off. - Career advancement and training opportunities.
Department:
Field Operations - Civil / Underground Utilities
Reports To:
Foreman / Superintendent
Location:
Columbus & New Albany, OH
FLSA Status:
Non-Exempt / Hourly
Position Summary
The Laborer supports underground utility, trenching, and duct-bank installation crews by performing a variety of physical and semi-skilled tasks on active construction sites. This position works closely with equipment operators and foremen to ensure safe, efficient, and high-quality installation of underground infrastructure for data-center and large-scale site development projects. The Laborer must demonstrate strong safety awareness, teamwork, and reliability in fast-paced construction environments.
Key Responsibilities
Site & Utility Support
- Assist in trenching, pipe laying, duct-bank, and vault installation. - Prepare, clean, and maintain work areas, trenches, and equipment. - Hand-grade, backfill, and compact soil using shovels, tampers, or compactors. - Help set trench boxes, slide-rail systems, and shoring equipment. - Install conduit spacers, tracer wire, and encasement for electrical and communication duct banks. - Support concrete encasement and formwork placement under supervision. - Spot and communicate with heavy equipment operators during excavation and backfilling.
Safety & Compliance
- Follow all company safety policies and OSHA Subpart P (Trenching & Excavation) standards. - Attend daily safety briefings and Job Hazard Analysis (JHA) meetings. - Use required PPE and maintain awareness of equipment and excavation zones. - Immediately report unsafe conditions or potential hazards to supervision. - Assist with traffic control, barricading, and trench protection setup.
Equipment & Material Handling
- Load, unload, and organize materials, tools, and equipment. - Perform routine maintenance and cleaning of tools and small equipment. - Operate hand and small power tools safely (e.g., cutoff saws, compactors, pumps). - Assist in verifying measurements, grades, and alignment.
Teamwork & Productivity
- Work cooperatively under direction of foremen and operators. - Maintain productivity standards while ensuring quality workmanship. - Support multiple phases of work and adapt to changing site conditions. - Uphold company values for safety, respect, and professionalism on every job site.
Qualifications
Required:
- 1+ years of experience in underground utilities, site development, or general construction. - Knowledge of trenching, shoring, and safe excavation practices. - Ability to understand and follow verbal and written instructions in English. - Reliable transportation to job sites within the Columbus / New Albany region. - Willingness to comply with drug testing and safety requirements. - Strong work ethic, punctuality, and commitment to teamwork.
Preferred:
- OSHA 10-Hour Construction Safety Certification. - Experience supporting data-center or mission-critical infrastructure projects. - Familiarity with duct-bank installation, conduit alignment, or vault work. - Competent Person or trench safety training (a plus).
Physical Requirements
- Ability to perform physical labor for extended periods (8-10 hours/day). - Frequent standing, walking, bending, and lifting up to 50 lbs. - Ability to work outdoors year-round in varying weather conditions. - Must be able to perform essential job functions with or without reasonable accommodation.
Work Environment
- Outdoor construction sites with exposure to dirt, dust, noise, and heavy equipment. - May require overtime, weekends, or night work depending on project schedule. - Projects primarily located in Columbus and New Albany, Ohio.
Compensation & Benefits
- Competitive hourly wage based on experience. - Overtime opportunities. - Health, dental, and vision insurance. - 401(k) with company match. - Paid holidays and time off. - Career advancement and training opportunities.