Energy Jobline ZR
Infrastructure & Capital Projects - Data Center Construction Mechanical Project
Energy Jobline ZR, Stillwater, Oklahoma, United States, 74074
Energy Jobline is the largest and fastest growing global Energy Job Board and Energy Hub. We have an audience reach of over 7 million energy professionals, 400,000+ monthly advertised global energy and engineering jobs, and work with the leading energy companies worldwide.
We focus on the Oil & Gas, Renewables, Engineering, Power, and Nuclear markets as well as emerging technologies in EV, Battery, and Fusion. We are committed to ensuring that we offer the most exciting career opportunities from around the world for our jobseekers.
Job DescriptionJob Description As Accenture continues to grow, we have an increasing number of career opportunities available to you. Depending on the job and location, you may be directed to apply with Accenture Infrastructure & Capital Projects LLP or one of the following Legal entities:
Accenture Infrastructure and Capital Projects, LLC
Accenture Infrastructure and Capital Projects Inc.
Please note that benefits can vary by country and role. Please check with your recruiter for more information.
You’ve Never Been Satisfied with “Good Enough.”
You want to make an impact, not just manage projects, but change how the world gets built. At
Accenture Infrastructure & Capital Projects,
you’ll do exactly that. You’ll help develop and deliver the factories, grids, transit systems, and public infrastructure that keep communities moving - and do it smarter, safer, and more sustainably than ever before.
You’ll work alongside people who think big and act bold - project managers, engineers, technologists, and strategists who blend real-world experience with digital innovation and AI. Together, we’re transforming how capital projects are planned, managed, and executed, creating a better way to build for the future.
Because “good enough” builds the past.
You’re here to build what’s next, on a team that outperforms every norm.
Visit us here to learn more about Accenture Infrastructure & Capital Projects
THE WORK:
You’ll run all aspects of mechanical design development, coordination, and installation for mechanical plant and equipment on data center projects, ensuring optimal performance and adherence to the highest industry standards.
You’ll oversee the design process and development for data center mechanical systems including HVAC, cooling systems, fire suppression, and plumbing.
You’ll provide input on mechanical system designs during project planning and contribute to the preparation of technical documentation and reports.
You’ll collaborate with vendors, contractors, and stakeholders to ensure all mechanical work meets project specifications and quality standards.
You’ll oversee the installation and commissioning of mechanical plant and equipment, including control systems, water treatment systems, HVAC, chillers, CRAC units, cooling towers, and other critical mechanical equipment, ensuring compliance with project requirements and industry standards.
You’ll conduct regular schedule and progress reviews, providing updates and insights to client teams and stakeholders.
You’ll oversee the diagnosis and troubleshooting of mechanical system issues during startup and commissioning.
You’ll communicate effectively with other team members to ensure alignment and smooth project execution, and identify, troubleshoot, and resolve issues in mechanical systems throughout the construction lifecycle.
You’ll oversee the preparation and maintenance of accurate QA/QC/Cx documentation, including test reports, issue logs, and punch lists.
You’ll oversee the provision of detailed turnover packages for operational teams upon project completion.
You’ll ensure all mechanical systems comply with applicable industry codes, standards, and safety regulations (e.g., ASTM, ASME, ASHRAE, AISC).
You’ll stay updated on the latest industry trends, standards, and technologies related to mechanical systems and share insights and knowledge with team members to promote best practices.
Onsite at client site : The work location for this role is onsite with our clients and partners to enable delivery and cultivate our client relationships
With all our roles, there is some in-person time for collaboration, learning and building relationships with clients, peers, leaders and communities. As an employer, we will be as flexible as possible to support your specific work/life needs.
HERE'S WHAT YOU'LL NEED:
Bachelor’s degree in mechanical engineering or a related field is required. field. OR additional four (4) years of related experience
6+ years of experience in mechanical engineering, preferably within a data center or critical environment
3+ years of senior level construction management or design management experience
Comprehensive understanding of HVAC systems, mechanical design principles, and relevant software tools (e.g., AutoCAD)
BONUS POINTS IF YOU HAVE:
Strong problem-solving abilities to identify issues and propose effective solutions
Good verbal and written communication skills for effective collaboration with team members and vendors
Ability to effectively lead a diverse team of professionals inside of a dynamic team environment while also being capable of taking initiative when necessary
Strong knowledge of industry standards such as ASHRAE, ISO, and NFPA related to mechanical systems
Experience with system performance monitoring, troubleshooting, and energy efficiency optimization
Experience with or coordination of mechanical design tools such as AutoCAD, Revit, or other relevant software
Goal–Oriented, Unity, Learning, Flexible
Compensation at Accenture varies depending on a wide array of factors, which may include but are not limited to the specific office location, role, skill set, and level of experience. As required by local law, Accenture provides a reasonable range of compensation for roles that may be hired in Illinois, Minnesota, California, Colorado, District of Columbia, Maryland, Massachusetts, New York, Ohio or Washington as set forth below.
We accept applications on an on-going basis and there is no fixed deadline to apply.
We believe that no one should be discriminated against because of their . All employment decisions shall be made without regard to , , creed, , , , origin, ancestry, status, veteran status, , or expression, genetic information, marital status, citizenship status or any other basis as protected by federal, state, or local law. Our rich makes us more innovative, more competitive, and more creative, which helps us better serve our clients and our communities.
For details, view a copy of the Accenture Equal Opportunity and Affinative Action Policy StatementAccenture is an EEO and affirmative action Employer of /Minorities/Veterans/Individuals with Disabilities. Accenture is committed to providing veteran employment opportunities to our service men and women.
If you are interested in applying for this job please press the Apply Button and follow the application process. Energy Jobline wishes you the very best of luck in your next career move.
#J-18808-Ljbffr
We focus on the Oil & Gas, Renewables, Engineering, Power, and Nuclear markets as well as emerging technologies in EV, Battery, and Fusion. We are committed to ensuring that we offer the most exciting career opportunities from around the world for our jobseekers.
Job DescriptionJob Description As Accenture continues to grow, we have an increasing number of career opportunities available to you. Depending on the job and location, you may be directed to apply with Accenture Infrastructure & Capital Projects LLP or one of the following Legal entities:
Accenture Infrastructure and Capital Projects, LLC
Accenture Infrastructure and Capital Projects Inc.
Please note that benefits can vary by country and role. Please check with your recruiter for more information.
You’ve Never Been Satisfied with “Good Enough.”
You want to make an impact, not just manage projects, but change how the world gets built. At
Accenture Infrastructure & Capital Projects,
you’ll do exactly that. You’ll help develop and deliver the factories, grids, transit systems, and public infrastructure that keep communities moving - and do it smarter, safer, and more sustainably than ever before.
You’ll work alongside people who think big and act bold - project managers, engineers, technologists, and strategists who blend real-world experience with digital innovation and AI. Together, we’re transforming how capital projects are planned, managed, and executed, creating a better way to build for the future.
Because “good enough” builds the past.
You’re here to build what’s next, on a team that outperforms every norm.
Visit us here to learn more about Accenture Infrastructure & Capital Projects
THE WORK:
You’ll run all aspects of mechanical design development, coordination, and installation for mechanical plant and equipment on data center projects, ensuring optimal performance and adherence to the highest industry standards.
You’ll oversee the design process and development for data center mechanical systems including HVAC, cooling systems, fire suppression, and plumbing.
You’ll provide input on mechanical system designs during project planning and contribute to the preparation of technical documentation and reports.
You’ll collaborate with vendors, contractors, and stakeholders to ensure all mechanical work meets project specifications and quality standards.
You’ll oversee the installation and commissioning of mechanical plant and equipment, including control systems, water treatment systems, HVAC, chillers, CRAC units, cooling towers, and other critical mechanical equipment, ensuring compliance with project requirements and industry standards.
You’ll conduct regular schedule and progress reviews, providing updates and insights to client teams and stakeholders.
You’ll oversee the diagnosis and troubleshooting of mechanical system issues during startup and commissioning.
You’ll communicate effectively with other team members to ensure alignment and smooth project execution, and identify, troubleshoot, and resolve issues in mechanical systems throughout the construction lifecycle.
You’ll oversee the preparation and maintenance of accurate QA/QC/Cx documentation, including test reports, issue logs, and punch lists.
You’ll oversee the provision of detailed turnover packages for operational teams upon project completion.
You’ll ensure all mechanical systems comply with applicable industry codes, standards, and safety regulations (e.g., ASTM, ASME, ASHRAE, AISC).
You’ll stay updated on the latest industry trends, standards, and technologies related to mechanical systems and share insights and knowledge with team members to promote best practices.
Onsite at client site : The work location for this role is onsite with our clients and partners to enable delivery and cultivate our client relationships
With all our roles, there is some in-person time for collaboration, learning and building relationships with clients, peers, leaders and communities. As an employer, we will be as flexible as possible to support your specific work/life needs.
HERE'S WHAT YOU'LL NEED:
Bachelor’s degree in mechanical engineering or a related field is required. field. OR additional four (4) years of related experience
6+ years of experience in mechanical engineering, preferably within a data center or critical environment
3+ years of senior level construction management or design management experience
Comprehensive understanding of HVAC systems, mechanical design principles, and relevant software tools (e.g., AutoCAD)
BONUS POINTS IF YOU HAVE:
Strong problem-solving abilities to identify issues and propose effective solutions
Good verbal and written communication skills for effective collaboration with team members and vendors
Ability to effectively lead a diverse team of professionals inside of a dynamic team environment while also being capable of taking initiative when necessary
Strong knowledge of industry standards such as ASHRAE, ISO, and NFPA related to mechanical systems
Experience with system performance monitoring, troubleshooting, and energy efficiency optimization
Experience with or coordination of mechanical design tools such as AutoCAD, Revit, or other relevant software
Goal–Oriented, Unity, Learning, Flexible
Compensation at Accenture varies depending on a wide array of factors, which may include but are not limited to the specific office location, role, skill set, and level of experience. As required by local law, Accenture provides a reasonable range of compensation for roles that may be hired in Illinois, Minnesota, California, Colorado, District of Columbia, Maryland, Massachusetts, New York, Ohio or Washington as set forth below.
We accept applications on an on-going basis and there is no fixed deadline to apply.
We believe that no one should be discriminated against because of their . All employment decisions shall be made without regard to , , creed, , , , origin, ancestry, status, veteran status, , or expression, genetic information, marital status, citizenship status or any other basis as protected by federal, state, or local law. Our rich makes us more innovative, more competitive, and more creative, which helps us better serve our clients and our communities.
For details, view a copy of the Accenture Equal Opportunity and Affinative Action Policy StatementAccenture is an EEO and affirmative action Employer of /Minorities/Veterans/Individuals with Disabilities. Accenture is committed to providing veteran employment opportunities to our service men and women.
If you are interested in applying for this job please press the Apply Button and follow the application process. Energy Jobline wishes you the very best of luck in your next career move.
#J-18808-Ljbffr