The California State University
Electrical Engineering Lecturer — Part-Time Impact
The California State University, San Luis Obispo, California, us, 93403
A prominent educational institution is seeking a part-time lecturer in Electrical Engineering for the 2025-2026 academic year. The ideal candidate will possess a B.S. and an M.S. in relevant fields and demonstrate proficiency in teaching and student-centered learning. Responsibilities include teaching undergraduate and graduate courses in areas such as digital design and electric power systems. Competitive compensation based on experience is available.
#J-18808-Ljbffr