Logo
Apex Companies

Construction Scheduler

Apex Companies, Brentwood, California, United States, 94513

Save Job

Are you highly motivated, hard‑working, and seeking to join a growth‑focused consulting & engineering firm? Are you looking for a company that will invest in your development and grow your professional skills? If so, consider a career with Apex! Powered by record sales, extraordinary client retention, strategic acquisitions, and an entrepreneurial spirit, Apex Companies is one of the fastest growing engineering and environmental consulting firms in the US. We take pride in providing our clients with exceptional service and have earned numerous awards for project excellence. We continue to grow, and we want you to grow with us.

We are seeking an experienced Scheduler/Dispatcher to oversee daily dispatching of crews and associated duties. The ideal candidate will be reliable, detail‑oriented, and positive, who will remain with the company long term and be part of our future growth and success. We are dispatching up to 9 EC crews and 5 Street Sweeping crews each day. The salary is competitive, paid holidays, vacation, medical, dental and 401K plans. Bilingual (Spanish) is important.

EROSION CONTROL, STREET SWEEPING & DEWATERING SCHEDULING

Take scheduling calls from clients and PMs throughout the workday

Add scheduling call‑ins to master schedule. Contact PM if more info needed ($ or scope)

Adjust schedule and check for changes multiple times. (deleted jobs, scope changes)

Create daily dispatch of schedule with truck/trailer #’s, crews & priority

Confirm needed equipment and materials are on hand

Include scope, details, maps and materials with job tags

Distribute schedule to crews and office (new format)

Use the same crew for multi‑day or specialized jobs whenever possible

Assign staggered start times – minimize daily texts

Order/call‑off rental equipment when needed

Order rock when needed

Review daily job tags & interview crews for missing details. Turn in completed job tags daily

Keep OT to less than 1 hour/man per day. Less than 1.5 hours per street sweeper driver per day

Report unfinished jobs to PM and roll to next day

MANAGE MATERIAL INVENTORY

Track erosion BMP inventory multiple times per week

Order materials as needed to stay above summer/winter minimums

Order dewatering materials

MANAGE TOOLS & EQUIPMENT

Track inventory on small tools i.e. picks, shovels, hammers, etc.

Track inventory and readiness on trenchers, pumps, hoses, etc.

Track vehicle, vactor, street sweeper & trailer readiness

GENERAL

Manage quick and efficient changes to daily schedule and routine

Participate in meetings as needed

Provide continuing customer service

Keep daily attendance log

Keep post‑con log

SAFETY

Maintain required safety certifications are current (First Aid, CPR, etc.)

Maintain/up‑date all safety manuals – IIPP, SDS sheets, fleet safety program etc.

Fulfill IIPP and SDS requests from clients

Monitor/enforce daily PPE use in the yard, warehouse and on the jobsite

What We’re Looking For

GED or high school diploma.

OSHA HAZWOPER certification preferred.

1‑2 years of construction experience with repair and construction of stormwater infrastructure, concrete structures, piping and detention/retention basins.

Safeland training preferred but not required.

Able to perform manual labor.

Knowledge of sediment and erosion control.

General carpentry and plumbing experience is helpful.

Comfortable using pickups/equipment trailers.

Good driving record.

Thorough understanding of safe work practices in accordance with OSHA regulations.

Why You’ll Love Working For Us

Company‑subsidized medical and dental.

Company‑paid life, short and long‑term disability.

401k match, tuition assistance, and more.

Cross‑training and the ability to work on a variety of projects.

Performance‑based bonuses or other incentives.

Working with the best and brightest in the industry.

1,800+ employee national firm with 50+ locations across the U.S.

Apex Job Title: SWIMS Scheduler

Hourly Expected Pay Range: $24 USD - $26 USD

We believe in equality for all and celebrate the diversity and differences of our employees, customers, and communities. We do not discriminate based on gender, race or color, ethnicity or national origin, age, disability, religion, sexual orientation, gender identity or expression, veteran status, or any other applicable characteristics protected by law. Apex aims to make apexcos.com accessible to all users. If you have a disability or special need that requires accommodation to navigate our website or complete the application process, please contact Talent@apexcos.com or (301) 417‑0200. Likewise, feel free to reach out to us if you would like to view or discuss Apex policy related to equal employment opportunity or have any related concerns. EO/AA/VEV/Disabled Employer

TO ALL RECRUITMENT AGENCIES: Apex Companies does not accept unsolicited agency resumes. Please do not forward resumes for any of our job postings to our career sites, or to any employees of Apex Companies or affiliates. Apex Companies is not responsible for any fees related to unsolicited resumes.

#J-18808-Ljbffr