NOV, Inc. National Oilwell Varco
Develop, maintain, and optimize the Master Production Schedule (MPS) within the ERP system, applying Demand Driven Operating Model (DDOM) principles and methodology to balance demand, capacity, and material constraints. Translate forecasts and sales Master Scheduler, Production, Scheduler, Project Management, ERP, Operations, Manufacturing