Logo
ZipRecruiter

Commissioning Manager - Data Center Construction

ZipRecruiter, Phoenix, Arizona, United States, 85003

Save Job

Job Description

Position: Commissioning Manager – Hyperscale Data Centers

Location: Phoenix, AZ (On-Site Full-Time)

Top 10 Electrical Contractor

A top-ranked electrical contractor is hiring a Commissioning Manager to lead the testing and turnover of hyperscale data center projects in the Phoenix market. This role ensures electrical systems are installed, tested, and commissioned to meet rigorous client, safety, and performance standards in high-pressure, fast-track environments.

Key Responsibilities:

Oversee and execute commissioning plans for electrical systems (MV/LV, UPS, generators, switchgear, etc.)

Coordinate with construction, QA/QC, engineering, and client teams to validate readiness

Manage startup, functional testing, and integrated system commissioning

Ensure all documentation is complete, accurate, and in alignment with client protocols

Troubleshoot system issues and lead root cause analysis when required

Interface directly with hyperscale clients, commissioning agents, and design teams

Maintain testing schedules and drive alignment across multiple commissioning phases

Lead turnover efforts and support final acceptance by client teams.

Required Skills & Experience:

8+ years of experience in electrical commissioning, startup, or QA/QC—preferably in mission-critical environments

Strong understanding of complex power systems, backup infrastructure, and controls

Experience with hyperscale data center commissioning or large MEP systems

Ability to lead testing teams and coordinate with diverse project stakeholders

Familiarity with commissioning software, reporting tools, and standards (e.g., ASHRAE/NIBS)

Qualifications:

Background in electrical contracting or field engineering

Commissioning certifications (CxA, BCxP, LEED Cx) a plus

OSHA 30 and strong safety leadership credentials