Pilgrim
Hatchery Embrex Crew Sanitation 2nd Shift
Pilgrim, Russellville, Alabama, United States, 35659
Hatchery Embrex Crew Sanitation 3rd Shift
Key Responsibilities and Account abilities include but are not limited to: De-stacking and cleaning chick boxes and all embrex related materials and/or machinery Sanitize all boxes, tray washer(s), and embrex equipment De-stack dirty chick boxes and load into tray wash with 140+ degree water, with approved sanitizer. Run boxes through tray washer and dip tank, and stack properly per PPC requirements to achieve the greatest amount of drying possible Run “Needles Cylinder” to check all of the needles, and replace if needed. Check for clogged needles while fluid is flowing on clean cycle. Clean it with wire in cup. Scub equipment with dish soap and rinse. Fill 5 gal “Clean Jug” with R/O water (3 gal). Put on sanitizer side. Take hose out of sanitizer and put in clean Jug (R/O Water). Press sanitizer screen. Run for at least 3 minutes or until out of water. If needed, catch tray and drainage reservoir should be emptied and rinsed. Ensure all areas are cleaned and sanitized before ending process. All other assigned task Work Environment/ Physical Demands
Ability to lift overhead of up to 50 pounds Ability to work in a heated environment, temperatures ranging from 80F to 100F Standing for extended periods of time Work in a fast-paced environment, with repetitive motion Ability to work overtime as assigned Frequently:lifting, turning, twisting, bending, squatting, pushing, grasping, kneeling, reach forward, pulling stretching. Knowledge, skills, and Abilities
High School Diploma or GED equivalent is preferred
#J-18808-Ljbffr
Key Responsibilities and Account abilities include but are not limited to: De-stacking and cleaning chick boxes and all embrex related materials and/or machinery Sanitize all boxes, tray washer(s), and embrex equipment De-stack dirty chick boxes and load into tray wash with 140+ degree water, with approved sanitizer. Run boxes through tray washer and dip tank, and stack properly per PPC requirements to achieve the greatest amount of drying possible Run “Needles Cylinder” to check all of the needles, and replace if needed. Check for clogged needles while fluid is flowing on clean cycle. Clean it with wire in cup. Scub equipment with dish soap and rinse. Fill 5 gal “Clean Jug” with R/O water (3 gal). Put on sanitizer side. Take hose out of sanitizer and put in clean Jug (R/O Water). Press sanitizer screen. Run for at least 3 minutes or until out of water. If needed, catch tray and drainage reservoir should be emptied and rinsed. Ensure all areas are cleaned and sanitized before ending process. All other assigned task Work Environment/ Physical Demands
Ability to lift overhead of up to 50 pounds Ability to work in a heated environment, temperatures ranging from 80F to 100F Standing for extended periods of time Work in a fast-paced environment, with repetitive motion Ability to work overtime as assigned Frequently:lifting, turning, twisting, bending, squatting, pushing, grasping, kneeling, reach forward, pulling stretching. Knowledge, skills, and Abilities
High School Diploma or GED equivalent is preferred
#J-18808-Ljbffr