Logo
J.S. Held LLC

Construction Delays & Disputes - Senior Consultant

J.S. Held LLC, Boston, Massachusetts, us, 02298

Save Job

Overview

2 days ago Be among the first 25 applicants J.S. Held is actively seeking a Senior Consultant to be part of our Construction Advisory Practice who focuses on claims and dispute resolution, delay analysis, project advisory services, construction cost analysis and controls, construction planning and scheduling. This position is for a professional with knowledge or experience in contract and/or change order management, critical path scheduling analysis, preparation of change orders or claims, cost analysis and quantification of damages, review of drawings and specifications, and other engineering and construction-related documents. Prior experience on active engineering or construction projects is highly preferred OR experience in claims and dispute resolution, delay analysis, project advisory services, construction cost analysis and controls, and scheduling." Job Responsibilities

Review and assess project change orders, including scope, costs, and schedules Review and analysis of project schedules, including delay analysis Loss of productivity and inefficiency analysis Calculation of damages including increased material, labor costs, or additional subcontractor costs Analysis of extended general conditions and other time-related costs Review and interpretation of drawings and specifications Assist in preparation of expert reports and presentations Able to lead small teams or professionals on engagements Produce work products, draft memos, presentations, and reports Travel as needed to project sites and client offices Qualifications

Required Qualifications

Bachelor's degree in Engineering (Civil, Structural, Mechanical, Chemical, Electrical, etc.) or Bachelor’s degree in Construction Management 4+ years experience with engineering or construction firms OR construction claim/dispute firm Microsoft Office - Advanced skills preferred (Excel, Word, PowerPoint) Bluebeam, Adobe, or other PDF management software Scheduling software - Microsoft Project or Primavera Hybrid schedule requiring you to come into the designated office Analytical aptitudes and attention to detail Critical thinking and problem-solving abilities Estimating experience preferred but not necessary Capability to develop Power BI dashboards preferred Preferred Qualifications

Progress toward registration certification or professional license (Oracle Primavera P6, OSHA 10, PSP, PMP, PMI-SP, PE, EIT, LEED, CSL) is a plus Membership or participation in industry trade organizations Physical And Mental Job Qualifications

Must be able to remain in a stationary position during work shift Must be able to travel both in the United States and internationally Character Requirements

Maintains Project Focus: Sees things through to completion and adapts to obstacles; completes work within designated timeframes Independently Project Leader: Works independently in a client-facing environment Analytical Thinker: Collects, organizes, and interprets data to support observations Skilled Communicator: Communicates effectively at all levels; maintains client and firm confidentiality Prioritizes Quality of Work: Produces accurate work and ensures quality Maintains Professionalism: Demonstrates positive attitude and professional conduct in hybrid environments Fosters Professional Entrepreneurial Spirit: Self-motivated to grow professionally Facilitates Teamwork: Works well within teams and fosters open communication Additional Information

Some of the Benefits We Have Include

Our flexible work environment allows remote work when needed Flexible Time Off policy Medical, Dental, and Vision Insurance 401k Match Commuter Benefits A reasonable estimate of the salary range for this role is $95k - $120k. The offered salary range is based on various factors including skillset, experience, location, and role scope. Other Duties: Please note this job description is not exhaustive. Duties may change at any time with or without notice. EEO and Job Accommodations: We embrace diversity and are committed to building an inclusive team. J.S. Held is an equal opportunity employer. Qualified applicants are considered without regard to sex, gender identity, sexual orientation, race, color, religion, national origin, disability, protected Veteran status, age, or any other protected characteristic. If you are an individual with a disability and require a reasonable accommodation during recruitment, please email jobs@jsheld.com with “Applicant Accommodation” in the subject line. All information will be kept confidential according to EEO guidelines. Seniority level

Associate Employment type

Full-time Job function

Administrative Industries

Business Consulting and Services

#J-18808-Ljbffr