Logo
Atlas NextWave

Senior Offshore Installation Manager

Atlas NextWave, New London, Connecticut, us, 06320

Save Job

Apply for the Senior Offshore Installation Manager role at Atlas NextWave.

Key Responsibilities

Plan feeder vessel loadouts and provide operational lookahead for port activities

Ensure a strong HSE culture on‑site through regular safety walks and operational safety assessments

Coordinate and supervise the work of main contractors on‑site

Oversee daily load‑out operations and issue Daily Progress Reports (DPRs) for the feeder vessel

Perform final vessel walkdowns following load‑out completion

Liaise with the offshore construction team to plan feeder vessel departures and returns

Monitor the progress of WTG component delivery, pre‑assembly, and readiness for load‑out

Manage client equipment, barge logistics, and spare parts inventory in New London

Facilitate MWS and CVA site attendance as required

Provide regular reporting and project updates

Requirements

Valid GWO Offshore certification and medical clearance for offshore work

U.S. Citizen or Green Card holder (required)

Solid understanding of stakeholders in U.S. offshore wind farm construction

Strong technical background in lifting operations and marine transportation

Knowledge of QHSE management principles

Background in construction, engineering, or marine operations

Prior experience with wind turbine installation or marine construction projects

Familiarity with BIMCO or FIDIC contracts (an advantage but not essential)

Seniority level Mid-Senior level

Employment type Contract

Job function Management

Industries Services for Renewable Energy

#J-18808-Ljbffr